Energy measurement and monitoring plan - Design and implementation - Principles for energy data collection

GSO EN 17267:2021 Files

GSO EN 17267:2021 Scope

This document specifies the requirements and principles for the design and implementation of an energy measurement and monitoring plan for an organization in order to improve its energy performance. The measurement and monitoring plan defines a measurement system for monitoring and analysing the energy performance of an organization, taking into account its influencing factors. This document applies to all forms of energy, to all energy uses and to all types of organizations. It does not apply to domestic dwellings.

Best Sellers From Electrical Sector

GSO 2530:2016
 
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
 
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR MOTOR VEHICLES AND INTERNAL COMBUSTION ENGINES
GSO 35:2007
 
Gulf Standard
Methods of test for lead-acid starter batteries used for motor vehicles and internal combustion engines
GSO 1899:2016
 
Gulf Standard
GCC Standard voltages and frequencies for AC transmission and distribution systems

Recently Published from Electrical Sector

GSO 2770:2024
 
Gulf Standard
WATER HEATERS - ENERGY PERFORMANCE REQUIREMENTS
GSO IEC 61076-2-116:2024
IEC 61076-2-116:2022 
Gulf Standard
Connectors for electrical and electronic equipment - Product requirements - Part 2 -116: Detail specification for circular connectors size 15 with up to 3+PE power contacts and auxiliary contacts, with bayonet-locking.
GSO IEC 61076-2-115:2024
IEC 61076-2-115:2023 
Gulf Standard
Connectors for electrical and electronic equipment - Product requirements - Part 2-115: Circular connectors - Detail specification for 12-pole shielded connectors with 2 A rated current and IP65/IP67 metal housing with push-pull locking
GSO IEC 60034-3:2024
IEC 60034-3:2020 
Gulf Standard
Rotating electrical machines - Part 3: Specific requirements for synchronous generators driven by steam turbines or combustion gas turbines and for synchronous compensators