GSO ISO/ASME 14414:2024

ISO/ASME 14414:2019
Gulf Standard   Current Edition · Approved on 14 October 2024

Pump system energy assessment

GSO ISO/ASME 14414:2024 Files

GSO ISO/ASME 14414:2024 Scope

This document sets the requirements for conducting and reporting the results of a pumping system energy assessment (hereafter referenced as "assessment") that considers the entire pumping system, from energy inputs to the work performed as the result of these inputs.

The objective of a pumping system energy assessment is to determine the current energy consumption of an existing system and identify ways to improve system efficiency.

These requirements consist of

— organizing and conducting an assessment,

— analysing the data from the assessment, and

— reporting and documenting assessment findings.

This document is designed to be applied, to open and closed loop pumping systems typically used at industrial, institutional, commercial, and municipal facilities, when requested.

This document is focused on assessing electrically-driven pumping systems, which are dominant in most facilities, but is also applicable with other types of drivers, such as steam turbines and engines. The document does not

a) specify how to design a pumping system,

b) give detailed qualifications and expertise required of the person using the International Standard although provides a list of body of knowledge in Annex C,

c) address the training or certification of persons,

d) specify how to implement the recommendations developed during the assessment, but does include requirements for an action plan,

e) specify how to measure and validate the energy savings that result from implementing assessment recommendations,

f) specify how to make measurements and how to calibrate test equipment used during the assessment,

g) specify how to estimate the implementation cost or conduct financial analysis for recommendations developed during the assessment,

h) specify specific steps required for safe operation of equipment during the assessment. The facility personnel in charge of normal operation of the equipment are responsible for ensuring that it is operated safely during the data collection phase of the assessment,

i) address issues of intellectual property, security, confidentiality, and safety.

Best Sellers From Mechanical Sector

GSO 42:2015
 
Gulf Technical Regulation
MOTOR VEHICLES - GENERAL REQUIREMENTS
GSO 159:1993
 
Gulf Technical Regulation
MOTOR VEHICLES – DIMENSIONS AND WEIGHTS
GSO 98:1988
 
Gulf Technical Regulation
MOTOR VEHICLES- FLAMMABILITY OF INTERIOR MATERIALS AND THEIR TESTING METHODS
GSO 1780:2010
 
Gulf Technical Regulation
Motor vehicle-vehicle identification number (vin) - requirements

Recently Published from Mechanical Sector

GSO EN 13445-6:2024
EN 13445-6:2021 
Gulf Standard
Unfired pressure vessels - Part 6: Requirements for the design and fabrication of pressure vessels and pressure parts constructed from spheroidal graphite cast iron
GSO ISO 11154:2024
ISO 11154:2023 
Gulf Standard
Road vehicles — Roof load carriers
GSO ISO 10468:2024
ISO 10468:2023 
Gulf Standard
Glass-reinforced thermosetting plastics (GRP) pipes — Determination of the ring creep properties under wet or dry conditions
GSO ISO 10300-1:2024
ISO 10300-1:2023 
Gulf Standard
Calculation of load capacity of bevel gears — Part 1: Introduction and general influence factors