GSO IEC TS 61400-25-71:2024
IEC TS 61400-25-71:2019
Gulf Standard
Current Edition
·
Approved on
14 October 2024
Wind energy generation systems - Part 25-71: Communications for monitoring and control of wind power plants - Configuration description language
GSO IEC TS 61400-25-71:2024 Files
No files are available for this standard right now!
You can buy this standard from any member store
GSO IEC TS 61400-25-71:2024 Scope
IEC TS 61400-25-71:2019 focus on the communications between wind power plant components such as wind turbines and actors such as SCADA systems. Non-IEC 61850/IEC 61400-25 internal communication within wind power plant components is outside the normative scope of the IEC 61400-25 series.
This document describes how to extend the IEC 61400-25 series with the IEC 618506 Substation Configuration description Language (SCL) file format for describing communication-related Intelligent Electronic Device (IED) configurations of a wind turbine, wind power plant controller, meteorological mast, etc. The extension of SCL to the wind domain is intended to simplify integration of wind power plant equipment for clients, as well as their integration to the electrical system. The adoption of SCL allows formalised tool-based exchange of IED parameters, communication system configurations, switch yard (function) structures, as well as description of the relations between them.
The purpose of this format is to formally and efficiently exchange wind turbine and wind power plant IED capability descriptions, and system descriptions between IED engineering tools and the system engineering tool(s) of different manufacturers in a compatible way. The file format is also intended to provide report configuration and alarms as well as HMI interface information from a wind power plant. This information can be used to engineer overlying SCADA systems for the site, for connected DSO, or TSO, or for fleet operators' maintenance and surveillance systems. Finally, the SCL is intended as a documentation of the configuration and topology of the delivered system.
This document describes how to extend the IEC 61400-25 series with the IEC 618506 Substation Configuration description Language (SCL) file format for describing communication-related Intelligent Electronic Device (IED) configurations of a wind turbine, wind power plant controller, meteorological mast, etc. The extension of SCL to the wind domain is intended to simplify integration of wind power plant equipment for clients, as well as their integration to the electrical system. The adoption of SCL allows formalised tool-based exchange of IED parameters, communication system configurations, switch yard (function) structures, as well as description of the relations between them.
The purpose of this format is to formally and efficiently exchange wind turbine and wind power plant IED capability descriptions, and system descriptions between IED engineering tools and the system engineering tool(s) of different manufacturers in a compatible way. The file format is also intended to provide report configuration and alarms as well as HMI interface information from a wind power plant. This information can be used to engineer overlying SCADA systems for the site, for connected DSO, or TSO, or for fleet operators' maintenance and surveillance systems. Finally, the SCL is intended as a documentation of the configuration and topology of the delivered system.
Best Sellers From Electrical Sector
GSO 2530:2016
Gulf Standard
Energy Labelling And Minimum Energy Performance Requirements For Air-Conditioners
GSO 34:2007
Gulf Technical Regulation
LEAD-ACID STARTER BATTERIES USED FOR
MOTOR VEHICLES AND INTERNAL
COMBUSTION ENGINES
GSO 35:2007
Gulf Standard
Methods of test
for lead-acid starter batteries used for motor vehicles
and internal combustion engines
GSO 1899:2016
Gulf Standard
GCC Standard voltages and frequencies for AC transmission and distribution systems
Recently Published from Electrical Sector
GSO 2770:2024
Gulf Standard
WATER HEATERS - ENERGY PERFORMANCE REQUIREMENTS
GSO IEC 60512-99-003:2024
IEC 60512-99-003:2023
Gulf Standard
Connectors for electrical and electronic equipment - Tests and measurements - Part 99-003: Endurance test schedules - Test 99c: Test schedule for balanced single-pair connectors separating (unmating) under electrical load
GSO IEC 60794-1-309:2024
IEC 60794-1-309:2023
Gulf Standard
Optical fibre cables - Part 1-309: Generic specification - Basic optical cable test procedures - Cable element test methods - Bleeding and evaporation of filling or flooding compounds, Method G9
GSO IEC 63119-1:2024
IEC 63119-1:2019
Gulf Standard
Information exchange for electric vehicle charging roaming service - Part 1: General